After several consultations with the general contractor, the following tasks were developed in their project plan. The items with an * are to be run in parallel.
- Task 1: Land Purchase
- Task 2: Architectural Plans
- Task 3: Financing*
- Task 4: Permit*
- Task 5: Initial Walkthrough Orientation
- Task 6: Excavation
- Task 7: Footings*
- Task 8: Foundation*
- Task 9: Drainage*
- Task 10: Backfill*
- Task 11: Framing
- Task 12: Pre-Drywall Walkthrough
- Task 13: Roofing*
- Task 14: Flashings*
- Task 15: Inspections*
- Task 16: Doors and Windows
- Task 17: Plumbing*
- Task 18: Heating*
- Task 19: Electrical*
- Task 20: Inspection
- Task 21: Exterior Finishes
- Task 22: Insulation*
- Task 23: Air-Vapor Barriers*
- Task 24: Cabinet and Electric Review*
- Task 25: Select Interior Finishes
- Task 26: Interior Finishes
- Task 27: Painting*
- Task 28: Cabinets*
- Task 29: Fixtures*
- Task 30: Landscaping*
- Task 31: Pre-Closing Walkthrough
- Task 32: Closing on New Home